Gledhill Super Recovery Vented Cylinders
The quick recovery cylinder has a special high performance heat exchanger which reduces boiler cycling and maximises the time the boiler can operate in condensing mode. It's special coil enables recovery in as little as 5 minutes, assuming a correctly sized boiler is installed.
The reduction in boiler cycling and faster recovery time combine to reduce the cost of producing hot water. The super recovery cylinders' high efficiency coil and its ability to heat only the water you require means that a smaller capacity cylinder can be used. This makes it the ideal replacement choice where space is an issue but rapid reheat times are still required.
The cylinders 35mm of high insulation Envirofoam further reduces standing losses - particularly benefical during summer months.
- Compression fittings
- Recovery from 5 minutes
- Recovers as it is being used
- For use with fully pumped systems
- 100% recyclable
- 2010 Part L1b compliant